FLAGSHIP PROJECTS

Projects

Rail · Highway Tunnels · Water & Environment — three business sectors across many provinces and project types

Key Projects Overview

Total contract value near RMB 700 million, covering urban rail, long tunnels, river treatment and sewage works

All Projects
Rail Transit Engineering
Highway Tunnels
Water & Environment Treatment
No. Project Name Contract Value Core Construction Scope Client
1 Chongqing Rail Transit Line 27 Civil 04 Section excavation & initial support RMB 401 million Zhongliangshan long mining-method tunnel: earthwork excavation, bolt grouting, shotcrete, steel frame installation Sinohydro Bureau 7
2 Baigou River Treatment Project (Gaobeidian Section) RMB 122 million Embankment reinforcement, river dredging, pavement, traffic-safety & greening Sinohydro Bureau 5
3 G4216 Ningpan Expressway Hengshan & Heishuihe Tunnel Project RMB 96.46 million Tunnel excavation, support & lining, portal and ancillary works Sichuan Road & Bridge Group
4 Chongqing Rail Transit Line 17 Phase 1 Sec.4 Daxuecheng Middle Rd Station RMB 67.68 million Mined station drill-blast excavation, initial support, rebar & concrete structures Sinohydro Bureau 7
5 Xiongxian Rural Domestic Sewage Treatment Concession Project RMB 55.25 million Earthwork, foundations, steel sheet piles, concrete sewage treatment Sinohydro Bureau 5
No. Project Name Contract Value Core Construction Scope Client
1 Chongqing Rail Transit Line 27 Civil 04 Section excavation & initial support RMB 401 million Zhongliangshan long mining-method tunnel Sinohydro Bureau 7
4 Chongqing Rail Transit Line 17 Phase 1 Sec.4 Daxuecheng Middle Rd Station RMB 67.68 million Mined station drill-blast excavation Sinohydro Bureau 7
No. Project Name Contract Value Core Construction Scope Client
3 G4216 Ningpan Expressway Hengshan & Heishuihe Tunnel Project RMB 96.46 million Tunnel excavation, support & lining, portal and ancillary works Sichuan Road & Bridge Group
No. Project Name Contract Value Core Construction Scope Client
2 Baigou River Treatment Project (Gaobeidian Section) RMB 122 million Embankment reinforcement, river dredging, pavement, traffic-safety & greening Sinohydro Bureau 5
5 Xiongxian Rural Domestic Sewage Treatment Concession Project RMB 55.25 million Earthwork, foundations, steel sheet piles, concrete sewage treatment Sinohydro Bureau 5
Flagship Project Details

Refining every detail to deliver project after project of excellence

🔹 Flagship Project 1: Chongqing Rail Transit Line 27, Civil 04 Section (Zhongliangshan Tunnel)
RMB 401 million

Project Overview

Chongqing Rail Transit Line 27 is 51.828 km long; this section includes the Ciqikou mined station and the Xiyong–Ciqikou interval. The Zhongliangshan mining-method tunnel reaches 260 m max depth, crossing fault zones, coal-seam gas, karst, goafs and water-rich strata (rock III–V) — a typical high-risk long tunnel.

Construction Scope

Earthwork excavation, bolt grouting, shotcrete, steel frame installation, etc.

Key Difficulties & Solutions

Multi-scale advanced forecast (TSP, geological radar, horizontal drilling, infrared water detection), strong-ventilation gas monitoring, fault pre-grouting, karst & goaf comprehensive treatment, in-tunnel drainage and three-stage sedimentation purification.

🔹 Flagship Project 2: Chongqing Rail Transit Line 17 Phase 1, Section 4 (Daxuecheng Middle Rd Station)
RMB 67.68 million

Project Overview

Line 17 Phase 1 is fully underground; Daxuecheng Middle Rd Station is a 14 m island interchange station built by side-wall drift method, with 445.07 m² excavation section, shallow-buried tunnel in sandstone-mudstone interbedded rock.

Construction Scope

Station drill-blast excavation, bolt grouting, initial support, rebar installation, waterproof concrete, ventilation shaft and TBM launch shaft support works.

Process Highlights

Side-wall drift effectively controls surface settlement; shallow sections use dense monitoring and advance small-pipe pre-support; standardized crews, dedicated posts and risk-list control.

🔹 Flagship Project 3: G4216 Ningpan Expressway Hengshan & Heishuihe Tunnels
RMB 96.46 million

Project Overview

Integrated highway-tunnel construction: excavation & transport, support & lining, ventilation & dust control, portal works.

Construction Scope

Full-process works on the Hengshan and Heishuihe tunnels: portal works, tunnel excavation, initial support, secondary lining, interior decoration and MEP (reserved).

Project Honors

Awarded in the G4216 Ningpan Expressway "100-Day Sprint to Secure Goals" labor competition Advanced Team honor.

🔹 Flagship Project 4: Baigou River Treatment & Xiongxian Rural Sewage Treatment
Total RMB 177 million

Project Overview

Full water-environment delivery — embankment dredging, road greening, rural sewage treatment, serving eco-civilization in all aspects.

Baigou River Treatment Project

Contract value RMB 122 million; main works: embankment reinforcement, river dredging, pavement, traffic-safety & greening; delivered and accepted.

Xiongxian Rural Sewage Treatment Project

Contract value RMB 55.2457 million; main works: earthwork, foundations, steel sheet piles, concrete sewage treatment, covering multiple Xiongxian villages.