CORE TECHNOLOGY

Core Technology

Five core capabilities plus standardized site management and intelligent equipment build modern construction strength.

Five Core Capabilities

Mining-method · Adverse Geology · Rail Support · Highway Tunnels · Water & Environment

1
Mining-method Tunnel Construction
Side-wall drift and controlled-blasting methods, suited to urban shallow-buried and deep long tunnels.
2
Complex Adverse-Geology Treatment
Comprehensive treatment of gas, karst, fault fracture zones, goafs and water-rich strata.
3
Rail Transit Support Works
Full construction of cut-and-cover stations, temporary facilities, TBM launch/reception shafts and ventilation shafts.
4
Full-process Highway Tunnels
Integrated excavation, support, lining and portal works.
5
Water & Environmental Works
River comprehensive treatment, dredging & reinforcement, rural sewage treatment and foundation steel-sheet-piling.
Core Technology Architecture

Starting from geological survey and supported by informatization and intelligence, covering the whole process of survey–design–construction–monitoring

Multi-scale Advanced Geological Forecast Multi-Scale Geological Forecast Mining-method Excavation Side-wall drift / controlled blasting / benching Adverse-Geology Treatment Gas monitoring / grouting reinforcement / curtain waterproofing Rail & Water Support TBM Launch Shaft / Steel Sheet Pile / Vent Shaft Intelligent Rebar Processing Equipment CNC bending / auto cutting / standardized yard Intelligent Gas Monitoring System Real-time monitoring / auto-alarm / cloud data Enclosed Muck Storage System Eco-compliant / smart dispatch / in-tunnel purification Standardized Site Management System Systems on wall · visible process · clear responsibility · closed-loop assessment · safety culture Standardized Material Yard Visual Disclosure Intelligent Monitoring safety culture closed-loop assessment
Standardized Site Management

Standardized Rebar Yard · Enclosed Muck Yard · Intelligent Gas Monitoring · Full In-tunnel Safety Monitoring

Standardized Rebar Processing Yard
① Standardized Rebar Yard
Equipped with gantry cranes, CNC bending centers and auto cutters, zoned by process: raw material, processing, semi-finished and finished-inspection areas for line production.
Intelligent Rebar Processing Equipment
② Intelligent Rebar Equipment
Using CNC rebar benders and auto cutters for high efficiency and low error; with QR-code traceability for full process tracking from raw material to finished product.
Enclosed Temporary Muck Yard
③ Enclosed Temporary Muck Yard
Muck is excavated, transported, stacked and sealed immediately to reduce dust and protect the environment; with on-site washing pools and three-stage sedimentation for compliant discharge.
Centralized Steel Processing Center
④ Centralized Steel Center
The site is equipped with a large centralized processing center, with complete supporting facilities such as spray dust suppression, safety signage and fire protection; the site is hardened, zoned and fixed-position arranged, setting a benchmark for standardized construction sites.
Advanced Geological Forecast Flowchart
⑤ Multi-scale Advanced Geological Forecast
A four-level system of long/medium/short-range and disaster-warning forecasts, optimizing TSP, geological radar, horizontal drilling, infrared water detection, geostress monitoring and surface geophysics.
Intelligent Gas Monitoring
⑥ Intelligent Gas Monitoring
Equipped with an automatic gas monitoring system for real-time in-tunnel collection and auto-alarm.

Crafting every project with expertise and technology

We look forward to joining hands for a win-win future.